For the Wastewater Treatment Plant Expansion for the City of Crown Point, CE Solutions provided structural engineering services for the following:

  • Renovations to the existing control building

  • Additions to the existing pretreatment building

  • Renovation and the addition of a holding cell to the existing primary tank

  • A new reinforced concrete aeration tank

  • Modifications to an existing return sludge flow division structure

  • Structural repairs to the existing filter building and sludge holding tank

  • New press wash water lift station

  • Modification of the existing aeration, chlorination and aerobic digesters

Constructed | 2010